RFC 0059: Waterfall clawback as a terminal true-up
Summary
RFC 0035 shipped the distribution waterfall and deferred clawback. RFC 0036 added IRR hurdles and deferred it again, noting that an IRR ladder makes it more pressing: a promote paid on an interim hurdle can later un-earn itself. Protocol §XVI records the expected shape — "a terminal true-up tier, not per-period state."
This contract implements that shape. It adds an optional clawback provision to distribution_waterfall and a stated clawback_amount outcome verified against a closed-form recomputation. It introduces no iteration, no per-period crystallization state, and no GP-side hurdle.
It extends the existing WF-NN family rather than opening a new one.
Motivation
The waterfall verifier already walks return-of-capital → preferred → catch-up → split over a §4.26 dated series and recomputes promote_total, profit_total and each party's moic / xirr (packages/uwmd-core/src/waterfall.ts). What it cannot express is the provision that governs what happens when that walk overpays the GP.
The overpayment is not hypothetical, and RFC 0036 named the mechanism precisely. A deal distributes strongly in years 2–4, clears a 12% IRR hurdle, and pays promote. A weak exit in year 7 drags the LP's final IRR to 9%. The LP's lifetime position now sits below the hurdle the promote was paid on. Every institutional LP agreement in this shape carries a clawback; the document has no way to say so, and no way to record the amount.
Concretely, today:
stated_outcomescan claimpromote_total: 4,180,000and the verifier will confirm the walk produces it — while the LP's ownxirrin the same object sits below the hurdle that promote was earned on, and nothing connects the two.- A reviewer reading the document cannot tell whether the promote is final or subject to return.
- The single most negotiated term in the LP agreement — whether the clawback is net of tax, and whether it is capped at promote received — is unrecordable.
Proposed change
Format §4.27 — the clawback provision
Add an optional object on distribution_waterfall:
"clawback": {
"basis": "lp_preferred_shortfall | lp_irr_floor | lp_em_floor",
"floor_rate": 0.12,
"floor_multiple": null,
"net_of_tax_rate": 0.37,
"cap": "promote_received"
}Normative rules:
basisis a closed vocabulary.lp_preferred_shortfall— the floor is the LP's return of capital plus the preferred return already declared by thepreferred_returntier. No extra input; refuse withWF-11if the waterfall has no such tier.lp_irr_floor—floor_rateREQUIRED, a fraction in(0, 1).lp_em_floor—floor_multipleREQUIRED, a number> 1.
capis"promote_received"and no other value. A GP cannot owe back more than it was paid; a provision that says otherwise is a different instrument and is out of scope. Stating any other value isWF-12.net_of_tax_rate, when stated, is a fraction in[0, 1)and is stated, not derived. This RFC does not model the GP's tax position; it records the rate the agreement names and applies it arithmetically.
stated_outcomes.clawback_amount
"stated_outcomes": {
"promote_total": 4180000.0,
"clawback_amount": 612400.0
}Verification — closed form, step 5 of the §VIII.10 walk
After the existing walk completes, and only when clawback is present:
- Compute the LP's floor requirement at the terminal date:
lp_preferred_shortfall→ LP contributions plus accrued preferred at the declared tier's rate and accrual, which the walk already computes;lp_em_floor→floor_multiple × lp_contributions;lp_irr_floor→ the RFC 0036 hurdle balance,B = −xnpv(F, h) · (1 + h)^t, evaluated over the LP's dated flows at the terminal row. This is the same closed form RFC 0036 uses foruntil_lp_irrand is reused verbatim. No bisection, no iteration onxirr.
shortfall = max(0, floor_requirement − lp_distributions_total).gross_clawback = min(shortfall, promote_total)— thecap.clawback_amount = gross_clawback × (1 − net_of_tax_rate)when the rate is stated, otherwisegross_clawback.- Compare to
stated_outcomes.clawback_amountat the currency quantum (WATERFALL_VERIFY_DECIMALS.currency, 2dp), consistent with every other figure the verifier checks.
That the whole computation is closed-form matters: the calc engine has no iteration, and a clawback design that needed a nested solve would be unreachable. Reusing RFC 0036's hurdle balance is what makes the IRR basis implementable at all.
Validator codes (extending WF-NN)
| Code | Severity | Refuses |
|---|---|---|
WF-10 | error | A basis outside the closed vocabulary, or a basis missing its required input |
WF-11 | error | lp_preferred_shortfall on a waterfall with no preferred_return tier |
WF-12 | error | A cap other than "promote_received" |
WF-13 | error | net_of_tax_rate outside [0, 1), or stated as a percent |
WF-15 | warning | A clawback provision on a waterfall whose series has no terminal distribution — the provision is unexercisable as stated |
Erratum (implementation). The draft above also specified WF-14 for a clawback_amount that disagrees with the recomputation. That code was not implemented and should not be: the waterfall splits validator codes (WF-01– WF-03, structure) from verifier issue codes (WF-OUTCOME-DISAGREES, arithmetic), and a stated-figure disagreement is squarely the latter. Adding a WF-NN for it would have created a second, parallel spelling of a refusal the verifier already reports. A stated amount on a waterfall with no provision is likewise WF-UNEVALUABLE rather than a failure — there is no recomputed figure to disagree with. This is the same class of erratum RFCs 0034–0036 recorded against their own drafts.
Library surface
No new export. verifyWaterfall gains the step; WaterfallStatedOutcomes gains clawback_amount?: number | null; a DistributionWaterfall.clawback? field is added. All additive.
Compatibility analysis
- Existing
.uw.mdfiles — unaffected. A waterfall with noclawbackbehaves byte-identically and takes exactly the path it takes today; the step is gated on the provision's presence. One conformance fixture proves it. - Existing implementers — Tier-1 and Tier-2 unaffected. A Tier-3 Calc Host that implements §VIII.10 must add step 5 to stay conforming for documents that use it; documents that do not use it are unchanged. Tier-4 agents may state the amount but never compute it (invariant 1).
- Modules — no manifest change.
- Protocol — additive: §VIII.10 gains step 5,
WF-NNgains six codes. Minor bump. - Excel parity — the clawback is a single terminal figure, not a schedule row, so the one-pack-drives-both invariant is satisfied by emitting it as a stated cell. No new rounding boundary: it quantizes at the same
round_toas every other currency figure in the verifier.
Conformance
- One engine-produced fixture per basis (
lp_preferred_shortfall,lp_irr_floor,lp_em_floor) where a clawback is genuinely owed. - One fixture where the LP clears its floor and the clawback is exactly zero — the case most likely to be got wrong by an implementer who forgets the
max(0, …). - One fixture where the shortfall exceeds promote received, proving the cap binds.
- One
net_of_tax_ratefixture. - One absent-case fixture proving an unchanged waterfall verifies as before.
- One fixture per refusal
WF-10–WF-14, plus theWF-15warning.
Delete nothing: unlike RFC 0036, this RFC retires no reserved-and-refused fixture, because clawback was deferred in prose rather than reserved in syntax.
Alternatives considered
- Per-period crystallization state. Rejected, and RFC 0035 rejected it first. Tracking crystallized versus at-risk promote per distribution needs state the walk does not carry and produces a different answer depending on when the reader stops. The terminal true-up is what LP agreements actually settle on.
- Bisection on the clawback amount. Rejected. It was the obvious design before RFC 0036 produced the closed-form hurdle balance; with that in hand, iteration buys nothing and costs determinism. This is the same erratum RFC 0036 recorded against RFC 0035's own sketch.
- A
clawbacktier in the tier list. Rejected. Tiers consume cash moving forward; a clawback moves cash backward after the last row. Modelling it as a tier would put a negative distribution in the schedule and break theby_tierinvariants. - GP-side hurdles (
until_gp_irr) in the same RFC. Rejected as uncoordinated scope. §XVI deliberately leftuntil_gp_irrout rather than reserved; it deserves its own contract.
Unresolved questions
- Interim clawback escrows. Many agreements escrow a share of promote rather than relying on a terminal claim. That is a sources-and-uses / reserve question adjacent to RFC 0056's escrow vocabulary, and is deliberately out of scope here. Whether it should be reserved-and-refused now, the
HDG-02posture, or simply left unnamed, is a reviewer call. - Whether
WF-15should be an error. A clawback on a waterfall with no terminal distribution is arguably as unreviewable asWF-02's missing cash vector. Proposed as a warning because the provision may be legitimately stated ahead of the exit. - Tax gross-up beyond a flat rate. Real agreements sometimes use the highest marginal rate then in effect rather than a stated one. Proposed: carry the stated rate only, consistent with this project's refusal to model tax positions.